TARGET CORPORATION PRODUCTION SERVICES
FACTORY PROFILE AND EVALUATION
HARDLINES
VENDOR: Prejecting 2500 Ltd
|
|
EVALUATOR:
|
REP: Helen Au Yeung
|
|
DATE: (mm/dd/yy) 22 Feb, 2006
|
TITLE: Director
|
|
Note: Items with “PT” should be done as part of plant tour.
PLANT INFORMATION
1.NAME: Taizhou Rival Arts Co., Ltd
|
|
CONTRACTOR:
|
2.ADDRESS: North Town Section West Industrial,
|
|
IF YES, LIST THE NAME OF CONTRACTORS:
|
Development Zone, Huangyan, Taizhou, Zhejiang
|
|
|
|
|
|
3.TELEPHONE NUMBER: 86-0576-4056288
|
|
|
|
|
|
4.FAX NUMBER: 86-0576-4067222
|
|
|
5.CONTACT PERSON: Pan Xiaohong
|
|
|
|
|
|
6.E-MAIL ADDRESS: tzrfgy@163.com
|
|
|
|
|
SCORE:
|
Area I - BUSINESS PRACTICES AND ADMINISTRATION:
(* A negative answer will equal an automatic failure)
7.
|
DOES THE PLANT CONFIRM IT COMPLIES WITH:
|
|
a.
|
LOCAL\NATIONAL ENVIRONMENTAL LAWS *
|
|
b.
|
LOCAL\NATIONAL OCCUPATIONAL SAFETY LAWS *
|
|
8.
|
DOES THE PLANT HAVE :
|
|
a.
|
CLEAR AISLES? * PT
|
|
b.
|
ARE THERE CLEAR EMERGENCY EXITS ON EACH FLOOR? * PT
|
|
c.
|
ARE THEY UNLOCKED? *
|
|
d.
|
ARE THEY ACCESSIBLE? *
|
|
e.
|
FIRE FIGHTING EQUIPMENT IN PROXIMITY OF WORK AREA? * PT
|
|
f.
|
FIRST AID EQUIPMENT ON PROXIMITY OF WORK AREA? * PT
|
|
g.
|
TRAINED MEDICAL PERSONNEL? PT
|
|
9.
|
IS RESIDENTIAL HOUSING PROVIDED? PT
|
|
a.
|
DOES IT COMPLY WITH PT 8? *
|
|
10.
|
WHAT IS THE MINIMUM WORKING AGE? 18 YEARS
|
|
|
DOES IT COMPLY WITH LOCAL, NATIONAL MINIMUM AGE LAWS? (TC REQUIRES A MINIMUM OF 14
|
|
|
OR OLDER) *
|
|
|
|
|
11.
|
WHAT IS THE MINIMUM WAGE (US$)?
|
|
|
SKILLED LABOR:HR\WK\MO 610RMB
|
|
|
UNSKILLED LABOR:HR\WK\MO 610RMB
|
|
|
DOES IT COMPLY WITH LOCAL AND\OR NATIONAL MINIMUM WAGE LAWS? *
|
|
|
|
|
12.
|
WHAT ARE THE NORMAL WORKING HOURS?
|
|
|
PER DAY: PER WEEK:
|
|
|
|
|
13.
|
WHAT IS THE EMPLOYEE HEADCOUNT?
|
|
|
TOTAL PLANT: QTY:
|
|
|
TOTAL QA: QTY:
|
|
|
|
|
14.
|
DO YOU MANUFACTURE IN CA OR NY?
|
|
a.
|
DO YOU HAVE A BUSINESS LICENSE? *
|
|
|
IF YES, PLEASE ATTACH A COPY.
|
|
|
|
|
15.
|
STAFFING RATIO:
|
|
a.
|
TOTAL PRODUCTION WORKERS RATIO
|
|
b.
|
INDUSTRIAL ENGINEERS RATIO
|
|
c.
|
MECHANICS RATIO
|
|
d.
|
IN-LINE QA AUDITORS RATIO
|
|
e.
|
PRODUCTION SUPERVISORS RATIO
|
|
f.
|
INDIRECT AND OTHER SUPPORT RATIO
|
|
g.
|
PRODUCTION SQUARE FOOTAGE RATIO
|
|
|
|
|
16.
|
IS THE BUILDING STEEL OR MASONRY?
|
|
Area II – MANUFACTURING
Total Points: 30
A. FACILITIES
17.
|
ARE AVAILABLE MACHINES\EQUIPMENT\FIXTURES SUITABLE TO PRODUCE CLIENT'S
|
|
|
|
PRODUCT? PT
|
2 pts.
|
|
|
|
|
|
18.
|
ARE MACHINES\EQUIPMENT PERIODICALLY MAINTAINED, CALIBRATED, AND CHECKED?
|
2 pts.
|
|
|
|
|
|
19.
|
DOES THE FACTORY POSSESS A STRONG MAINTENANCE TEAM?
|
2 pts.
|
|
|
|
|
|
|
|
|
|
20.
|
IS THE TOTAL PRODUCTION MACHINERY OPERATED UNDER A MAINTENANCE SCHEDULE?
|
2 pts.
|
|
|
|
|
|
|
|
|
|
21.
|
ARE INJECTION, ROTOCAST MOLDS, SPRAYING MASKS STORED TO AVOID RUST OR BEING
|
|
|
|
WORN OUT? PT
|
2 pts.
|
|
|
|
|
|
22.
|
LIST MAJOR MACHINERY\UTILITIES IN FACTORY ON A SEPARATE PAGE (INCLUDE NUMBER
|
|
|
|
OF UNITS AND AGE)
|
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/ 10
|
B. COMMUNICATION & DOCUMENTATION CONTROL :
23.
|
DO FACTORY’S MANAGEMENT AND KEY STAFF UNDERSTAND ENGLISH SUFFICIENTLY TO
|
|
|
|
ENSURE COMMUNICATION ?
|
2 pts.
|
|
|
|
|
|
24.
|
IS THERE AN ADEQUATE AND FORMAL SYSTEM FOR RECEIVING PURCHASE ORDERS?
|
1 pt.
|
|
|
|
|
|
25.
|
IS THERE AN ADEQUATE AND FORMAL SYSTEM FOR RECEIVING AND APPLYING
|
|
|
|
DRAWINGS, PROCEDURES, DESIGN CHANGE, ETC., CORRECTLY?
|
1 pt.
|
|
|
|
|
|
26.
|
ARE DRAWINGS, RECORDS, AND SPECIFICATIONS EASILY AVAILABLE THAT REFLECT A
|
|
|
|
HISTORY OF CHANGES?
|
1 pt.
|
|
|
|
|
|
27.
|
IN THE CASE OF AUTHORIZED SUBCONTRACTING, DOES FACTORY PROVIDE ADEQUATE
|
|
|
|
SUPERVISION AND SPECIFICATIONS TO ENSURE THE COMPLIANCE TO THE
|
|
|
|
REQUIREMENTS OF CLIENT’S STANDARDS?
|
2 pts.
|
|
|
|
|
|
28.
|
DOES FACTORY HAVE CLEAR INSTRUCTIONS TO ITS DEPARTMENTS TO DELEGATE
|
|
|
|
AUTHORITY TO STOP PRODUCTION IF THE PRODUCTS DO NOT MEET REQUIREMENTS OF
|
2 pts.
|
|
|
CLIENT’S STANDARDS?
|
|
|
|
|
|
|
29.
|
DOES FACTORY WORK CLOSELY AND EFFICIENTLY WITH CLIENT ON THE ASSIGNED
|
|
|
|
PROJECT TO ADVISE AND DISCUSS ANY FAILURE ON PROCESSING PROBLEMS?
|
1 pt.
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/10
|
C. PACKING:
30.
|
IS THE PACKING AREA TIDY AND FREE OF CONTAMINATION? PT
|
1 pt.
|
|
|
|
|
|
31.
|
IS THERE ADEQUATE SAFEGUARD TO PREVENT ANOTHER COMPANY'S PRODUCTS FROM
|
|
|
|
BEING PACKED INTO MASTER CARTON?
|
1 pt.
|
|
|
|
|
|
32.
|
IS THERE ADEQUATE CONTROL TO PREVENT ANY DEFECTIVE OR REJECTED PRODUCTS
|
|
|
|
FROM BEING PACKED INTO MASTER CARTON?
|
1 pt.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
33.
|
ARE FINAL FINISHED PRODUCTS WELL SEGREGATED FROM SEMI-FINISHED PRODUCTS IN
|
|
|
|
THE PACKING AREA? PT
|
1 pt.
|
|
|
|
|
|
34.
|
ARE FINISHED PRODUCTS PACKED OR PROPERLY STORED IMMEDIATELY TO AVOID DUST
|
|
|
|
AND DIRT? PT
|
1 pt.
|
|
|
|
|
|
35.
|
ARE PRODUCTS PASSED THROUGH METAL DETECTORS BEFORE PACKING?
|
1 pt.
|
|
|
(ONLY APPLICABLE TO PRODUCTS WITHOUT METAL COMPONENTS OR CHILDREN
|
|
|
|
PRODUCTS)
|
|
|
|
|
|
|
36.
|
ARE PACKED MASTER CARTONS STORED IN A COVERED AREA OR A GOOD SHELTER TO
|
|
|
|
KEEP FROM SUNSHINE AND TO AVOID BEING FLOODED OR RAINED UPON?
|
1 pt.
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL :
|
|
/ 7
|
D. NON-CONFORMING MATERIALS:
37.
|
IS NON-CONFORMING MATERIAL PROPERLY SEGREGATED AND IDENTIFIED AT ALL
|
|
|
|
STAGES? PT
|
1 pt.
|
|
|
|
|
|
38.
|
ARE ADEQUATE RECORDS MAINTAINED TO SHOW THE STATUS OF SUCH NON-
|
|
|
|
CONFORMING MATERIALS?
|
1 pt.
|
|
|
|
|
|
39.
|
DO RECORDS SHOW THAT REWORKED PARTS\ MATERIALS HAVE BEEN REINSPECTED TO
|
|
|
|
COMPLY WITH STANDARDS?
|
1 pt.
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/ 3
|
Area III – QUALITY
Total Points: 70
A. SYSTEMS
40.
|
IS THERE A FORMAL QA PROGRAM?
|
10 pts.
|
|
|
(WRITTEN PROCEDURES BEING USED, RECORDS OF DEFECT LEVELS,DCL'S)
|
|
|
|
|
|
|
41.
|
IS THERE IN-PROCESS QUALITY CONTROL?
|
1 pt.
|
|
|
|
|
|
42.
|
ARE DEFECT RECORDS KEPT?
|
4 pts.
|
|
|
MACHINE:
|
|
|
|
OPERATOR:
|
|
|
|
FINAL:
|
|
|
|
|
|
|
43.
|
IS THERE QC SUPERVISOR\MANAGER ON ALL SHIFTS?
|
5 pts.
|
|
|
|
|
|
44.
|
IS QA INDEPENDENT OF PRODUCTION?
|
5 pts.
|
|
|
|
|
|
|
|
|
|
45.
|
ARE THERE FORMAL TRAINING PROGRAMS?
|
3 pts.
|
|
|
OPERATOR:
|
|
|
|
INSPECTION:
|
|
|
|
MECHANIC :
|
|
|
|
|
|
|
46.
|
DO YOU INSPECT TO A STANDARD AQL?
|
4 pts.
|
|
|
WHAT IS YOUR AQL? 0,2.5,4.0
|
|
|
|
|
|
|
47.
|
WHAT IS THE PERCENT OF SECONDS?
|
|
|
|
|
|
|
48.
|
ARE PRODUCT SPECIFICATIONS BEING USED?
|
1 pt.
|
|
|
BY WHOM?
|
|
|
|
|
|
|
49.
|
ARE PACKAGING SPECIFICATIONS BEING USED?
|
1 pt.
|
|
|
BY WHOM?
|
|
|
|
|
|
|
50.
|
SHADE CONTROLS?
|
1 pt.
|
|
|
|
|
|
51.
|
ARE THE FACTORY'S QC PERSONNEL CERTIFIED BEFORE THEY PERFORM THEIR JOB AS
|
|
|
|
OUTLINED IN THE QC PROCEDURE?
|
1 pt.
|
|
|
|
|
|
52.
|
DOES THE FACTORY USE INTERNATIONAL, NATIONAL, CLIENT'S, OR ITS OWN APPROVED
|
|
|
|
STANDARDS TO PERFORM IN-HOUSE QUALITY CONTROL?
|
1 pt.
|
|
|
|
|
|
53.
|
DOES FACTORY HAVE A DETAILED WRITTEN PLAN DEMONSTRATING HOW SAFETY
|
|
|
|
REQUIREMENTS ON PRODUCTS ARE CHECKED IN HOUSE?
|
1 pt.
|
|
|
|
|
|
54.
|
DOES QC FULLY UNDERSTAND FACTORY'S QUALITY POLICY AND THE IMPORTANCE OF
|
|
|
|
THE QUALITY ASSURANCE CONCEPT?
|
1 pt.
|
|
|
|
|
|
55.
|
DOES QC HAVE ADEQUATE BASIC KNOWLEDGE AND EXPERTISE ON PRODUCTS TO BE
|
|
|
|
MADE AND GENERAL MANUFACTURING TECHNOLOGY?
|
1 pt.
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/ 40
|
B. PRODUCT PERFORMANCE TESTING:
56.
|
DO YOU HAVE ON-SITE TESTING? PT
|
5 pts.
|
|
|
|
|
|
57.
|
ARE RECORDS KEPT?
|
5 pts.
|
|
|
BY WHOM?
|
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/ 10
|
C. INCOMING INSPECTIONS:
58.
|
HAS THE FACTORY TAKEN ADEQUATE MEASURES TO ASSURE RAW MATERIALS
|
|
|
|
CONFORM TO REQUIRED SPECIFICATIONS BEFORE USE?
|
1 pt.
|
|
59.
|
ARE INCOMING AND OUTGOING RAW MATERIALS MONITORED AND DOCUMENTED?
|
1 pt.
|
|
|
|
|
|
60.
|
ARE RAW MATERIALS KEPT IN CONTROLLED STOREROOMS TO AVOID THEFT, LOSS, AND
|
|
|
|
DETERIORATION?
|
1 pt.
|
|
|
|
|
|
61.
|
ARE RAW MATERIALS, IF NECESSARY, INSPECTED BEFORE PRODUCTION? ARE
|
|
|
|
RECORDS TRACEABLE? IS THE INSPECTION SAMPLING SCHEDULE ADEQUATE? PT
|
1 pt.
|
|
|
|
|
|
62.
|
ARE THERE WRITTEN RAW MATERIAL INSPECTION INSTRUCTIONS AVAILABLE AS
|
|
|
|
GUIDELINES TO INSPECTORS?
|
1 pt.
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/ 5
|
D. FINAL INSPECTIONS:
63.
|
DOES FACTORY'S QC PERFORM INTERNAL FINAL RANDOM INSPECTION (FRI)?
|
5 pts.
|
|
|
|
|
|
64.
|
ARE INTERNATIONAL, CLIENT'S, OR OTHER APPROVED STANDARDS USED?
|
1 pt.
|
|
|
|
|
|
65.
|
ARE THERE WRITTEN FORMAL INSPECTION REPORTS AND FILED FOR REVIEW?
|
1 pt.
|
|
|
|
|
|
66.
|
ARE CUSTOMER DRAWINGS\SPECIFICATIONS READILY AVAILABLE FOR QUALITY
|
|
|
|
CONTROL OR ENGINEERING DEPARTMENT ON REQUEST?
|
1 pt.
|
|
|
|
|
|
67.
|
IS THE SAMPLING SIZE OF PRODUCTS FOR FINAL INSPECTION SUFFICIENT FOR A
|
|
|
|
STATISTICAL ANALYSIS OF THE QUALITY OF MERCHANDISE?
|
1 pt.
|
|
|
|
|
|
68.
|
ARE THERE PROCEDURES TO REQUIRE ACCEPTABLE INSPECTION REPORTS TO
|
|
|
|
AUTHORIZE THE SHIPMENT OF THE PRODUCTS?
|
1 pt.
|
|
|
|
|
|
69.
|
DOES FACTORY PERFORM 100% OR STATISTICAL CHECK ON FUNCTIONALITY?
|
5 pts.
|
|
|
|
|
|
|
|
|
|
|
SUB-TOTAL:
|
|
/ 15
|